Customization: | Available |
---|---|
Certification: | CE, ISO, SGS |
Total Power: | 36.66kw |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product feature:
Adopt international up-to-date Control System,America PMAC Mootion controller card to know well of the figures.
Before cutting the whole line,recognizing the nearest cutting line,it follows the shortest way and reduce the process of cutting to improve the Efficiency.
Support DXF format,it's easy to lead the Auto CAD,CAXA and etc.into mapdepot.
Commerical advanced spline running function(recognize figures by PMAC card).Template-scan,CAD spline,acieveing perfect accuracy and avoid the eachange error.Supplement and corretion of the original function,tit can set the original point twice.
The accuracy is ±0.15mm,meet the requirements of PV products,windshields glass,mirror glass and etc.
Product name |
Horizontal glass production line |
Max glass size(mm) |
3300*14000 |
Min glass size(mm) |
300*450 |
Glass thickness(mm) |
4-80 |
Speed(m/min) |
0-5 |
This machine is consists of three parts: feeding section, washing section and unloading.
Insulating glass production line machine was packed in plastic stretch film coating; steel pallet and plywood case package;
It was shipped by sea or customized.
Q1: The MOQ for insulating glass production line machine?
A: 1 set.
Q2: How do I get fast response?
A: Send the E-mail to us or call us directly.
Q3: What about the lead time?
A: Sample usually needs 5-7 days, mass production time needs 15-30 days
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping is also optional for big quantity.
Q5. How to proceed an order for your products?
a: Firstly let us know your requirements or needs.
b: Secondly We quote according to your requirements or our suggestions.
c: Thirdly customer confirms the samples and places deposit for formal order. Also you can get the testing if necessary.
d: Fourthly We arrange the production and ship to you.